English

News

Qassim Farm: HSE inspections ahead of the fourth quarter

2026-11-167 views

As Qassim Farm moves into the fourth quarter, the site team has completed a full health, safety and environment (HSE) inspection across the construction and operating areas. The inspection is part of a routine cycle: every system, temporary facility and access route is checked against the same standard, whether the farm is in build, commissioning or production.

Machinery, lifting and site-vehicle checks at Qassim Farm.
Machinery, lifting and site-vehicle checks at Qassim Farm.

Qassim is a large desert site with several activities running in parallel. Construction crews, commissioning engineers, growers and logistics teams share roads, power and water. Safety therefore cannot sit in a separate plan; it has to be built into the daily sequence and the handover between teams.

Eight areas checked on site

The inspection covered the highest-risk interfaces first, then the supporting facilities that keep the site running:

  • Machinery and lifting. Guards, emergency stops, lifting points, rigging and exclusion zones around active equipment.
  • Temporary power. Earthing, leakage protection, cable routing, distribution boards and lockout/tagout.
  • Living quarters. Fire prevention, escape routes, electrical safety, sanitation and heat protection.
  • Kitchen and gas. Gas storage, leak detection, ventilation and fire suppression.
  • Wastewater. Containment, treatment, discharge routes and prevention of standing water.
  • Flood and drainage. Channels, culverts, pumps and low points ahead of seasonal rain.
  • Site security. Perimeter control, access records, lighting and emergency communications.
  • Commuting vehicles. Driver qualification, journey management, rest hours and vehicle condition.

Findings were assigned to a named owner with a closure date. Items that could be corrected immediately were closed during the walk-down; the rest were added to the site action list and reviewed at the weekly coordination meeting.

Training and reporting

Temporary power and distribution boards inspected on site.
Temporary power and distribution boards inspected on site.
The inspection is supported by weekly toolbox talks. Each session focuses on one activity and one failure mode, so the team practices the response rather than only reading a procedure. Incidents and near misses are classified by severity and reported through the same channel, which makes trends visible before they become injuries.

Safety is a design and operating discipline. A farm that runs continuously has to make the safe way the normal way.

The next inspection cycle will follow the same scope, with additional checks on the systems handed over from commissioning. The objective is simple: enter the quarter with no unresolved high-risk item and a team that knows what to do when a condition changes.

← Back to news